Free no-obligation quotes. Send us photos on WhatsApp

Wiltshire · BA12

Home Renovation in Warminster

Strip-out, first fix, plastering, second fix and decoration in the right order, handled by one person so the house stays as liveable as it can.

Rated Excellent on Rated People

Home Renovation in Warminster

Home renovation in Warminster covers a wide spread of houses, from a market-town terrace with its chimney breasts to a 1960s estate house with its original everything. What links them is the sequence. Strip-out first, then structure and first-fix plumbing and electrics, then plastering and drying, then flooring and joinery, then second fix, tiling and painting. Do the steps out of order and the new decoration gets cut into.

One person coordinating the work means one set of dust sheets and one conversation. We plan how you will live in the house meanwhile: which rooms stay usable, where the skip goes, and how dust is kept out of the rest. In older buildings and listed homes in and around the centre, check with the council before altering walls, plaster or windows, and mention the status of your home in your first message.

Expect surprises behind old finishes. When one turns up, we show you, explain the options and agree the next step before carrying on. Send photos of each room on WhatsApp, say what you want done, and we will give you a free, no-obligation quote.

Everything included in home renovation

Watch

How we approach home renovation

A 31-second look at the way we work, from our base in Frome to homes in Warminster and the villages around it.

In this video

  • One person, many trades
  • Plastering to painting
  • Planned once, done in order
Watch full size and read the transcript

Homes in Warminster

Home Renovation in Warminster: what we look out for

1950s–70s estate homes
Most of the work in a Warminster estate house is in rooms that were never altered: a boxy kitchen, a separate WC, a back bedroom with a leaning wall. The plumbing and wiring are probably original, so refresh them while the plaster is off. Textured ceiling finishes and old floor tiles from that era can contain asbestos, so leave them untouched, tell us what you have and have them checked first.
Victorian & Edwardian terraces
Solid walls and no damp-proof course make damp and condensation regular visitors to Warminster terraces. Gutters, pointing, ground levels and airflow are checked before anyone replasters. Sagging ceilings over lath, loose plaster behind old paper and a chimney breast opened up for a stove all turn up, so we assess the walls before deciding what stays and what comes off, and keep dust off the floors we are not working on.
Stone cottages & farmhouses
Thick stone walls hold moisture and rarely dry quickly, so cottages in Corsley and Sutton Veny often need breathable plaster and paint, not hard cement or vinyl. Gutters and soil levels outside are checked first, then ventilation indoors. Uneven walls mean plaster built up to suit the stone, and a decorating coat only goes on after the wall has had time to dry. Old finishes come off with care.
Modern & new-build homes
Renovation in a newer estate home tends to mean new partitions, replacing builder-grade fittings and tackling condensation in well-sealed rooms where ventilation matters. Stud walls and plasterboard are quick to alter, but cables and pipes follow set routes, so these are located before anything is cut. Check the paperwork from the builder before altering things, then keep a record of what was changed.

Planning in Warminster

What to plan for with home renovation in Warminster

  • Agree the order of trades

    Each trade depends on the one before. Pipes and cables go in before plastering, plaster has to dry before paint, and flooring goes down before skirting is finished. Writing the order down at the start stops decisions being made twice. We share the sequence with you, along with the points where we need a choice from you, such as tile or door handles.

  • Plan how you will live in the house

    Decide which rooms must stay usable and for how long. A kitchen and the only bathroom should never be out together. Dust sheets across doorways, a sealed route to the skip and a clean-down at the end of each day keep the rest of the house tolerable. Tell us about pets, children and anyone working from home.

  • Allow for surprises behind old finishes

    Old houses hide things. Rotten joists under a bathroom, an old flue behind a plastered wall, or wiring that stops at a join under the floor can all appear once the finishes come off. We photograph what we find, explain the options and agree the next step with you before work carries on, so costs are discussed when they arise.

What customers say

Real reviews from real homeowners

“Pleasant polite tidy, carried out work quickly and efficiently”
Mrs Jill, BA2Verified · October 2025
“I would highly recommend Krzysztof he was professional, good time keeper and took pride in his work very pleased with the finished Bathroom makeover”
Sarah, BA5Verified · May 2025
Read all reviews on Rated PeopleSee our Google reviews

Written reviews are copied word for word from our public Rated People profile. The Google rating comes from our public Google Business Profile.

Getting started

Getting a home renovation quote in Warminster

  1. 1Message us on WhatsApp with photos, rough measurements and what you would like done.
  2. 2We ask anything else we need and give you a free, no-obligation quote. Larger jobs usually need a visit first.
  3. 3You agree the plan and we book you in. One person, one point of contact, start to finish.
What affects the price of home renovation
Loading map…
  • Our base in Frome
  • Main areas
  • Local villages
  • Also covering

Questions

Home Renovation in Warminster: FAQs

Can you renovate one room at a time while we live in the house?

Yes, and many jobs are done that way. We plan the order so the kitchen and the only bathroom are never out together, hang dust sheets over the doorways to keep the dust in, and tell you which rooms are usable at each stage. A whole-house job at once is quicker overall but more disruptive, so we talk about which suits you.

Do I need Building Control approval for a renovation?

Not for everything, but structural changes, new or altered electrical circuits, drainage changes and some insulation or ventilation work can need approval or notification. Redecorating and like-for-like repairs usually do not. Check with Building Control or your local council, and say if your home is listed. We confirm exactly what applies to your job when we quote.

What should I do about damp in my Warminster cottage before redecorating?

Find the cause first. Look at gutters, downpipes, ground levels against the wall and any leaking pipes, then at ventilation. Painting over damp, or sealing a stone wall with hard cement, usually pushes the moisture sideways or back out through the paint. Message us photos of the stains and the outside of the wall and we will look at it before anything is covered.

Free, no-obligation

Get your free quote

The quickest route to an accurate price is a WhatsApp message with photos. The more you can tell us, the more precise we can be.

  • A few photosThe room as it is now, from the corners, plus anything awkward like pipes, windows or radiators.
  • Rough measurementsWall lengths are plenty to start with. We will confirm exact sizes before ordering anything.
  • What you wantWhat stays, what goes, any products you have already chosen, and when you would like it done.

hello@fixedandfitted.co.uk

Tell us about the job

We will move it straight into WhatsApp so you can add photos and measurements.

We use your details only to reply to your enquiry and to quote for the work. See our privacy policy.