Free no-obligation quotes. Send us photos on WhatsApp

Planning

How to Prepare Your Home for a Kitchen or Bathroom Fit

Good preparation makes a kitchen or bathroom fit calmer for you and smoother for the fitter, because nothing stops while someone moves furniture or hunts for a stopcock. Here is a practical checklist for before the work starts.

Updated 7 October 2026 · 5 min read

Access and parking

The fitter and the delivery driver both need a clear route from the front door to the room. Units, worktops and boxes of tiles are heavy and awkward, so move shoe racks, bikes, pushchairs and hallway furniture out of the way. Mention tight stairs, low ceilings or narrow doorways when you first get in touch, because long worktops and tall units may not get round them. Parking close to the house saves a lot of carrying, so sort out a permit or a reserved space early if you need one. In a flat, ask the building manager about lift booking and when noisy work is allowed.

Clear the room and protect the rest of the house

Empty the room completely, including the insides of cupboards and drawers. A kitchen packed into boxes at the last minute is far more stressful than one cleared gradually, so start sorting early. Take down pictures, mirrors and shelves, and move anything fragile out of neighbouring rooms too. Stripping out a kitchen or bathroom makes fine dust that finds its way everywhere.

We lay protection on floors along the route through the house and in the working room, and keep doors closed to limit dust, but it helps if hall rugs and loose items are already lifted. Cover or take down curtains, and put sheets over furniture in adjoining rooms. If any flooring is staying, tell us, so it is protected properly rather than assumed to be coming up.

Temporary kitchen and washing arrangements

Plan for a kitchen that does not exist for a while, or a bathroom you cannot use. A little organisation is the difference between a minor inconvenience and a house that feels unliveable, and it takes the pressure off the fitter too, because nobody is rushing to give you a working room back before it is properly finished.

  • Kitchen: set up a kettle, microwave, toaster, small table and washing-up bowl in another room
  • Kitchen: move the fridge, or a cool box, out of the work area, and keep a few freezer meals and disposable plates to hand
  • Bathroom: agree where everyone will wash, and which toilet will be used if the house only has one
  • Tell us if anyone in the house has mobility needs, so access and washing can be planned around them

Pets, children and the rest of the household

A working room has tools, offcuts, adhesive and open doors, and none of that mixes with pets or small children. Keep them out of the work area and away from the route to it. If a dog or cat might slip out while doors are open for deliveries, shut them in a room or arrange for them to be elsewhere. Warn anyone who works from home or needs quiet for naps, because drilling, cutting and stripping out are noisy. Tell us if anyone has breathing difficulties, because dust is part of the job.

Water, electric and deliveries

You do not need to turn the water or electric off. We do that ourselves, and we will tell you in advance when a supply is going off so you can plan around it. What helps is knowing where the stopcock and consumer unit are, and showing us when we arrive. Think about the freezer, the broadband router and anything you work from. If the water will be off for a stretch, fill a few containers for drinking and flushing.

Deliveries need a dry, secure place to sit, such as a garage or spare room. Keep worktops flat and supported, and never leave units out in the rain. Check each delivery against the order for damage and missing parts as soon as it arrives, and keep the packaging until the fit is finished so any problem can be reported to the supplier.

Decisions to make before start day, and what happens on site

Most delays on site come from decisions not yet made. Settle the tile layout and grout colour, handle and tap choices, shower valve and towel rail positions, socket and switch heights, and where the bin and appliances will sit. If you change your mind, say so before that stage is built, because hidden work is hard to redo.

A normal working day follows a rhythm. We arrive at the agreed time, lay protection, carry on with that stage of the job, then clear up and sweep before leaving, with water and power back on wherever possible. We tell you what is happening next and anything we have found. You do not need to supervise, but keep a phone nearby for quick questions.

Next steps

Walk the route from your front door to the room, note any tight turns, and photograph it along with the room itself, the stopcock and the consumer unit. Add measurements and send them to us on WhatsApp, with a note of anything about pets, children or working from home that we should know. We will talk through the plan and give you a free, no-obligation quote.

Quick answers

Do I need to turn off the water and electric before the fitter arrives?

No. We turn the water and electric off ourselves when the work needs it, and we tell you in advance so you can plan around it. It helps if you show us where the stopcock and consumer unit are when we arrive.

Can I stay at home while my kitchen or bathroom is being fitted?

Usually yes. You need a temporary kitchen or washing arrangement, and pets and children kept clear of the work area. Dust and noise are part of it, so some people prefer to be out. Tell us your circumstances and we will plan around them.

What should I do with my old kitchen or bathroom fittings?

Tell us before the start whether you want anything kept, such as units to reuse or fittings to sell. Everything else is stripped out, and who takes the waste away should be agreed when the quote is given.

Watch: kitchen fitting in 31 seconds

Read the transcript

Keep reading

More guides

Bathrooms

Wet Room or Walk-In Shower? How to Choose

Wet room or walk-in shower? Compare floors, waterproofing, drainage, ventilation and access, so you can choose the right one. Free quote on WhatsApp.

5 min read · 7 October 2026

Free, no-obligation

Get your free quote

The quickest route to an accurate price is a WhatsApp message with photos. The more you can tell us, the more precise we can be.

  • A few photosThe room as it is now, from the corners, plus anything awkward like pipes, windows or radiators.
  • Rough measurementsWall lengths are plenty to start with. We will confirm exact sizes before ordering anything.
  • What you wantWhat stays, what goes, any products you have already chosen, and when you would like it done.

hello@fixedandfitted.co.uk

Tell us about the job

We will move it straight into WhatsApp so you can add photos and measurements.

We use your details only to reply to your enquiry and to quote for the work. See our privacy policy.